SV Operations Schedule and release calendar
SV Operations Schedule and release calendar
The official SV Operations Schedule (also called the Canton Network release calendar) lives at: https://sv-cal.canton.foundation/ Use that calendar whenever you need a specific release date, upgrade window, or network operations timeline. It is the source of truth for scheduled network activity across DevNet, TestNet, and MainNet.What the calendar covers
Typical calendar items include:- Weekly upgrades — regularly scheduled Splice version upgrades
- Minimum Splice versions — when the minimum required Splice validator version changes
- Minimum Splice DAR versions — when minimum required
.darpackage versions change - Splice Daml model effectivity — when specific Splice Daml model versions become effective
- Protocol upgrades (LSU) — Logical Synchronizer Upgrades, including related topology freeze windows
- Other network configuration changes — settings or feature enablement that take effect on a given date
How to use it for common questions
| Question | Where to look |
|---|---|
| When is the next release or upgrade? | SV Operations Schedule |
| What is the release date for a DevNet / TestNet / MainNet change? | Filter by network on the calendar |
| When is the next LSU or topology freeze? | Look for Protocol Upgrades (LSU) and Topology Freeze events |
| When do minimum Splice or DAR versions change? | Minimum Splice Versions / Minimum Splice DAR versions events |