Submitting the formal proposal for CLTC infrastructure and liquidity seeding via Node Yield Hub LLC. This proposal outlines the core architecture, milestones, and funding requirements for establishing a secure, institutional-grade Litecoin bridge on the Canton Network. Looking forward to the committee's review and connecting with a Tech & Ops champion.
CLTC Institutional-Grade Tokenization (North Ledger LLC)
Opened 30-03-2026 by NodeYieldHub, last activity 5d ago
- Incoming206 days30-03-2026
- Declinedsince 22-10-2026
- Discussion
- 2 messages
- 2 people
Discussion2 comments, 0 reviews, 0 inline comments
1 automated message from bots hidden. Show bot messages
Showing 1 to 2 of 2, oldest first.
Update on Proposal Details:
Hi team, just a quick heads-up that I pushed a minor revision to the proposal today.
- Updated our corporate entity name to North Ledger LLC.
- Clarified the scope of Milestone 3 to reflect a shift from a public retail dApp to a secure, permissioned Institutional OTC Portal.
The total funding request and the underlying bridge architecture remain exactly the same. Looking forward to the committee's review!
Closing this proposal PR — Dev Fund 2.0 transition
The update window outlined in our earlier notice has ended, and we are now closing this PR as part of the transition to Dev Fund 2.0.
If you believe this PR was closed in error, need help with the transition, or have any questions or issues, please email d***@canton.foundation.
Thank you for your proposal and your interest in contributing to the Canton ecosystem
Proposal file proposals/CLTC-Proposal-NorthLedger.md, 5 KB
Title: Proposal - CLTC: Institutional-Grade Litecoin Tokenization Entity: North Ledger LLC Lead Architect: Manny (Active Canton Validator Node Operator) Project Status: Seeking Tech & Ops Champion
-
Abstract This proposal outlines the development, deployment, and liquidity seeding of CLTC, a natively wrapped, 1:1 backed Litecoin asset for the Canton Network. Crucially, the underlying native Litecoin will be strictly custodied utilizing a 2-of-3 multi-signature architecture via regulated providers (BitGo / Coinbase). By merging institutional-grade custody with decentralized ledger technology, CLTC will provide the Canton ecosystem with secure, high-velocity "Silver" liquidity, designed specifically for institutional OTC settlement and integration into lending protocols.
-
Motivation & "Common Good" Currently, the Canton Network lacks a dominant, institutionally backed Litecoin bridge. As a high-velocity settlement asset, introducing LTC to Canton drives significant transaction volume. Beyond the immediate utility of CLTC, this project will open-source the underlying Daml smart contract architecture. This provides the Canton developer community with a standardized, audited template for bridging non-EVM assets using regulated custodians.
-
Architecture & Risk Management To eliminate single points of failure and ensure cryptographic proof of reserves, CLTC relies on a distinct separation of powers:
Custody: BitGo / Coinbase (2-of-3 Multi-Sig) acts as the custodian securing the native LTC reserves.
Logic: Daml smart contracts enforce strict mint/burn parity, listening for custodial API confirmations.
Infrastructure: Deployment and ledger communication facilitated via Obsidian.
Liquidity Seeding: The pilot is backed by a verifiable $20,000 USD equivalent of native LTC deposited directly into the custodial vault prior to mainnet deployment.
- Milestones & Funding Request (Note: Funding requests are calculated in CC. Current exchange rate estimated at $0.15 per CC).
Milestone 1: Core Engine & Institutional Pilot
Deliverables: Proof of Capital: Depositing the initial $20k LTC collateral into a regulated custodial vault to secure official API credentials and verifiable receipts.
Sandbox Testing: Developing the core Daml smart contract logic and utilizing a simulated (mock) API to safely test the mint/burn engine in a local, isolated environment without risking live funds.
Funding Request: 435,000 - 500,000 CC
Milestone 2: Security & Testnet Deployment
Deliverables: Code deployed to the Canton Testnet. A comprehensive third-party security audit of the Daml contracts is completed and published.
Funding Request: 265,000 - 335,000 CC
Milestone 3: Secure Institutional OTC Portal
Deliverables: Development of a high-security, permissioned interface designed exclusively for institutional mint/burn requests. Unlike retail-facing dApps that rely on public wallet connections, this infrastructure focuses on OTC-style workflows. Funds will support the engineering of administrative dashboards for manual ledger reconciliation, end-to-end encryption, and strict institutional access control (IAM) systems.
Funding Request: 300,000 - 400,000 CC
Milestone 4: Mainnet Launch & CantonSwap Utility
Deliverables: Official deployment of CLTC to the Canton Mainnet. Direct integration of CLTC into CantonSwap to immediately bootstrap trading volume.
Funding Request: 335,000 - 400,000 CC
Milestone 5: Open-Source Ecosystem Template
Deliverables: Packaging and releasing the backend bridging logic as a public good for the Canton developer community, fully documented.
Funding Request: 135,000 - 200,000 CC
Milestone 6: Multi-DEX & Liquidity Provider Expansion
Deliverables: Expanding CLTC routing beyond the initial DEX by integrating the asset into at least three additional decentralized exchanges or institutional liquidity providers on the Canton Network, solidifying it as a core ecosystem settlement layer.
Funding Request: 200,000 - 300,000 CC
Total Estimated Funding Request: ~ 1,670,000 - 2,135,000 CC
- Phase II: Go-to-Market & Institutional Onboarding Following the successful technical execution of Milestones 1 through 6, the project will shift focus toward enterprise business development. The primary objective of Phase II will be conducting targeted client outreach to successfully onboard at least three major institutional liquidity providers to actively utilize the CLTC OTC portal. This strategic expansion is designed to drive the high-velocity transaction volume necessary to achieve and sustain Featured Application status on the Canton Network.
Journey on the board 2 moves
- Now: Declined, 5.6 days since 22-10-2026
- First human response: 206 days after opening, by hythloda (committee side)
- Outcome: closed without merging on 22-10-2026, 206 days after opening
- Incoming30-03-2026 to 22-10-2026206 daysmoved by github-project-automation
- Declined22-10-2026 to now5.6 daysmoved by github-project-automation
Rebuilt from the recorded board moves (complete history). get_dev_fund_lifecycle(number) gives the same in the MCP.
Timeline 11 events
- 30-03-2026review requested from team:admins by NodeYieldHub
- 30-03-2026review requested from tkatrichenko by NodeYieldHub
- 30-03-2026review requested from hythloda by NodeYieldHub
- 30-03-2026review requested from stas-sbi by NodeYieldHub
- 30-03-2026review requested from waynecollier-da by NodeYieldHub
- 30-03-2026review requested from isegall-da by NodeYieldHub
- 30-03-2026added to the project board by github-project-automation[bot]
- 30-03-2026moved to another column of the project board by github-project-automation[bot]
- 07-04-2026title changed by NodeYieldHub
- 22-10-2026closed by hythloda
- 22-10-2026moved to another column of the project board by github-project-automation[bot]