Skip to content
CCPEDIAby Unity Nodes
Incoming#861Pull requestEquilibrium (equilibrium.co)RFP #23: Validator and Shared Infrastructure Security and Resilience

Proposal: Canton Horizon, the runway module of the Canton Validator Reliability Suite

Opened 28-09-2026 by t00tslast activity 1mo ago

  1. Incoming48 days so far28-09-2026
  2. Needs Championnot reached
  3. In Reviewnot reached
  4. Ready for Votenot reached
  5. Voting Livenot reached
  6. Approvednot reached
Waiting on
Nobody has picked it up
idle 48 days
Funding request
800,000 CC
Champion named in file
Heslin Kim, Zenith (@heslin-zenith)
Duration
~3 months engineering, adoption window to month 12, quarterly maintenance
Organization
Equilibrium (equilibrium.co)
RFP or roadmap area
RFP #23: Validator and Shared Infrastructure Security and Resilience

Development Fund Proposal Submission

Proposal file:
rfps/security-assurance-incident-readiness/2026-09-Equilibrium-Horizon.md

Applicant

Organization:
Equilibrium

Author / Primary Contact:
Olli Tiainen (olli@equilibrium.co)

Champion:
Heslin Kim, Zenith (@heslin-zenith)


Proposal Classification

Proposal Type:

  • RFP-aligned proposal
  • Individual initiative

RFP / Roadmap Area:
RFP #23, Validator and Shared Infrastructure Security and Resilience

Label:
node-deployment-operations


Funding & Timeline

Total Funding Request:
800,000 CC base. Maintenance is priced separately at 45,000 CC per quarter for four quarters, so 980,000 CC is the maximum.

Project Duration:
~3 months engineering, adoption window to month 12, quarterly maintenance

Maximum Amount:
N/A

Maximum Duration:
N/A


Summary

Canton Horizon lets validator operators see how long their node's purchased traffic and Canton Coin will last at its measured consumption rate, and whether its top-up settings keep pace with that rate. It reads the node's metrics, its Scan proxy and its deployment configuration, and labels where each reference value came from. It is the runway module of the open-source Canton Validator Reliability Suite.


Submission Checklist

  • Full proposal file is included in this PR
  • Organization and primary contact identified
  • Champion identified or Needs Champion selected
  • RFP / roadmap alignment identified, if applicable
  • Total funding request provided
  • Project duration provided
  • Proposal is within any RFP maximum amount
  • Proposal is within any RFP maximum duration
  • Milestones and milestone funding are defined in the proposal
  • Acceptance criteria are based on ecosystem value
  • Architectural alignment is addressed

Milestones 5

  1. The Suite frame~1 month from grant start. If another Suite module has already shipped the frame
  2. Canton Horizon published~1 month from grant start
  3. The path for providers without node access, and the upstream contributions~2 months from grant start
  4. Release tracking, fleet mode and handover~3 months from grant start
  5. Adoption