Needs Champion#746 Pull requestK2F LabsRFP 3, Automated Application Management. Secondary RFP 18, Integration into SDLCs.

DAR Relay: Cross-Organization and Automated DAR Distribution and Deployment

Opened 29-08-2026 by kevmuko, last activity 28d ago

  1. Incoming0 days29-08-2026
  2. Declined2.5 days29-08-2026
  3. Needs Champion51 days so far31-08-2026
  4. In Reviewnot reached
  5. Ready for Votenot reached
  6. Voting Livenot reached
  7. Approvednot reached
Waiting on
Waiting on the committee
idle 29 days
Funding request
1,800,000 CC
Champion named in file
Needs Champion
Duration
6 months engineering (Milestones 1 to 3), adoption window 12 months from Milestone 3 acceptance
Organization
K2F Labs
RFP or roadmap area
RFP 3, Automated Application Management. Secondary RFP 18, Integration into SDLCs.

Development Fund Proposal Submission

Proposal file:
/proposals/2026-08-K2FLabs-dar-relay.md

Applicant

Organization:
K2F Labs

Author / Primary Contact:
Kevin Ko, kko@k2flabs.com

Champion:
Needs Champion


Proposal Classification

Proposal Type:

  • RFP-aligned proposal
  • Individual initiative

RFP / Roadmap Area:
RFP 3, Automated Application Management (Protocol, Infrastructure, Scalability & Resilience). Secondary RFP 18, Integration into SDLCs.

Label:
dar-app-management


Funding & Timeline

Total Funding Request:
1,800,000 CC (engineering 1,050,000 CC, adoption up to 750,000 CC)

Project Duration:
6 months engineering, adoption window 12 months from Milestone 3 acceptance

Maximum Amount:
N/A

Maximum Duration:
N/A


Summary

A developer who wants a validator provider to run a new Daml release sends the DAR over chat, an operator uploads and vets it per participant, and the developer keeps track of who has finished, because Canton propagates package vetting metadata but never the package itself. DAR Relay is an Apache-2.0 Rust service that each validator provider runs beside its nodes: developers submit releases through the provider's portal or canton-deploy and follow approval and per-host deployment status, while the provider's operators review each submission with its automated checks attached, approve it under their own policies, and let the service upload and vet the package on the participants hosting the affected parties. When a party is hosted by more than one provider, an approved release can be forwarded to the other providers' Relay instances for their own review, and a deployment report names the hosts that still need it. This delivers the review, approval, installation and upgrading that RFP 3 asks for, requires no changes to Canton or Splice, and consumes the funded registry, metadata and analysis work rather than repeating it.


Submission Checklist

  • Full proposal file is included in this PR
  • Organization and primary contact identified
  • Champion identified or Needs Champion selected
  • RFP / roadmap alignment identified, if applicable
  • Total funding request provided
  • Project duration provided
  • Proposal is within any RFP maximum amount
  • Proposal is within any RFP maximum duration
  • Milestones and milestone funding are defined in the proposal
  • Acceptance criteria are based on ecosystem value
  • Architectural alignment is addressed

Milestones 4

  1. Reconciliation engine and pre-flightMonth 2
  2. Upgrade gate, cross-organization drift and GitOpsMonth 4
  3. Developer and provider portalMonth 6
  4. Adoption12-month window from Milestone 3 acceptance